Skip to main content

The Value of Client Satisfaction

500 Barrel Slug Catcher Installation

A gas plant in Church Buttes Wyoming required a larger slug catcher to handle the large slugs exiting the pipeline. To rectify this issue, the client requested that REDD provide the engineering, design & construction management, and all associated piping required for a 500 barrel slug catcher.

REDD was responsible for providing engineering services and oversee all aspects of the installation, which consisted of earthwork excavation for slug catch foundation and pipe support piers by use of hydro-vac, concrete work, working with slug catcher fabricator, engineering and design of all associated piping/equipment, and complete management of construction. REDD was always onsite ready to solve any unforeseen issues during construction while supervising proper installation and hydrostatic testing of all piping and slug catcher.

REDD is always committed to client satisfaction in delivering projects within scope, schedule and budget. Because of the overall excellence in this project’s quality, budget, and delivery, the client wrote us a generous letter of recommendation and INVITED US BACK TO INSTALL ANOTHER SLUG CATCHER FOR THEIR CANYON CREEK PLANT.

Related Posts